Power Augmentation

About

What is the Power of Agreement/Contract?

Contractual power is the power that is agreed to be drawn upon the customer's request and to be drawn in the contract or the amount of power for which certain provisions have been made.

What is Installed Power?

In a consumption unit, the capacity that the installation system can handle and the electricity network can carry is the name given to the maximum capacity.

What is Demand?

Demand, at any point of consumption at any time (in 15-minute averages) at a meter indicates the maximum power (in kW) drawn from the power supply. This value for each reading period is reset to zero, so that the demand value of the consumption point is updated every month.

What is Power Boosting, When Is It Done?

When the Demand power of an enterprise exceeds its contractual power, it is subject to you need to notify the energy distribution company and make a new contract. This application process is briefly called power increase. If the demand value read by your meter exceeds your contracted power when it starts, I'm going to tell you “you need to increase power” a notification containing the explanation through the notification. A power increase request must be made within 30 days from the date of notification. Power increase request, Electricity Market Connection and System Utilisation Regulation provisions must be done within the framework. Failure to fulfil the power increase obligations if it is detected that consumers consume irregular electrical energy in excess of the contractual power sanctions are applied according to the provisions of the regulation. In order to make a power increase application, it is not necessary to receive a notification from the meter reader institution. does not exist. When a situation occurs that increases the operating power (adding a new machine, etc.) You can also request an increase in your contractual power with your request. In the notification sent by the distribution company / meter reader institution, your contract power exceeded and the power value you exceeded. The maximum power used in total here (Demand) value, power can be increased. For example, your installed power is 35 kW and Your demand value taken from the electricity meter was 42 kW. In this case Distribution company / The meter reader organisation sees that you are using more power than your electrical installation capacity and requests a project to be made for power increase. To be changed in line with the need and The values of the materials to be increased are briefly as follows; - Cross-section of the main energy cable supplying the plant - Maximum current rating of the main switch - Proportion of current transformers - Type of counter

How to Boost Power?

Some documents are required to make a power increase. These are respectively

1-Title deed or lease contract
2-Tax plate
3-Signature declaration
4-Power of attorney

An application is made to our company with these documents. Our authorised engineers come to your company organises a FREE discovery. The discovery will decide how much power you want or how much a power addition should be made, if this power increase will be in the company, what kind of arrangements it is determined that it should be done. Upon requests and discovery, our authorised engineers will prepare a The project is drawn and a request for additional power increase is opened to the required energy institution.

Post-request Transactions

After the approval process of your drawn project, the new energy required by the energy board how it will be supplied to your company is determined. After this accepted specification, DBA (Distribution Connection Agreement) is made, the energy company is an energy company as much as the power increase made in this agreement. determines the price and the transactions are completed after this payment.

Meters and Equipment According to Installed Power Size:

If it's Bedaş

1-9 kW Normal Counter
10-39 kW Combi Meter + Compensation Panel
40 kW and above X5 Counter + Compensation Panel

If it's AYEDAŞ

1-14 kW Normal Counter
15-49 kW Combi Meter + Compensation Panel
50 kW and above X5 Counter + Compensation Panel





3 Faz Engineering © All Rights Reserved 2023 | Privacy Policy